Community Auto Connection
Home » USA » GA » Dalton » BMW » M4 » 2016 BMW M4 Base

2016 BMW M4 in Dalton, GA - $29,874

0 Reviews

I'm interested
Message Successfully Sent!
Dealer
Hello,
I would like to learn more about the 2016 BMW M4 that you have in your inventory. Please contact me as soon as you can.
Thank you.
By using this feature, you agree to EveryCarListed.com’s Terms of Use.
Vehicle Highlights
Price
$29,874
Mileage
93,582
Color
Gray
Condition
Used
Drivetrain
RWD
Engine
6 CYL.
Transmission
7-Speed Double Clutch
Fuel
VIN
WBS3R9C54GK338524
Stock Number
4493S
Location
US, GA
Features
ABS Brakes (4-Wheel)
Adjustable Rear Headrests Integrated Headrests
Air Conditioning - Front - Automatic Climate Control
Air Conditioning - Front - Dual Zones
Air Conditioning Air Filtration: Active Charcoal
Airbags - Front - Dual
Airbags - Front - Knee
Airbags - Front - Side
Airbags - Front - Side Curtain
Airbags - Passenger - Occupant Sensing Deactivation
Airbags - Rear - Side Curtain
Ambient Lighting
Armrests - Rear Center
Audio - Antenna: Diversity
Audio - Premium Brand: Harman-kardon
Audio - Radio: AM/FM
Audio - Radio: HD Radio
Audio - Radio Data System
Audio - SiriusXM Satellite Radio
Audio - Speed Sensitive Volume Control
Audio Auxiliary Input: IPod/IPhone Integration
Audio Auxiliary Input: Jack
Audio Auxiliary Input: USB
Audio In-Dash CD: Single Disc
Audio MP3 Player: CD MP3 Playback
Audio Streaming: Bluetooth
Audio System - 20GB Hard Drive
Audio System 16 Speakers
Audio System 600 Watts
Audio Voice Recognition
Auto-Lock
Braking Assist
Cargo Area 12V Power Outlet
Cargo Area Floor Mat
Cargo Area Light
Center Console Trim Carbon
Center Console Trim Leather
Child Seat Anchors LATCH System
Clock
Compass
Cruise Control
Crumple Zones Front
Daytime Running Lights
Digital Odometer
Driver Seat Adjustable Lumbar Support: 4-Way Power
Driver Seat Heated
Driver Seat Power Adjustments: 10
Driver Seat Power Adjustments: Recline
Electronic Brakeforce Distribution
Emergency Braking Preparation
Emergency Interior Trunk Release
Engine Auto Stop/Start
Engine Push-Button Start
Exhaust Quad Exhaust Tips
Exhaust Tip Color Chrome
Exterior Mirrors Auto-Dimming
Exterior Mirrors Heated
Exterior Mirrors Power
External Temperature Display
Floor Mat Material Carpet
Floor Material Carpet
Floor Mats Front
Front 12V Power Outlet(s)
Front Brakes Ventilated Disc
Front Headrests Integrated
Front Seatbelts: 3-Point
Front Suspension Classification: Independent
Front Suspension Type: Strut
Fuel Economy Display MPG
Grille Color Black
Headlights Auto Delay Off
Headlights Auto On/Off
Headlights Cornering
Headlights HID
Headlights Self-Leveling
Impact Sensor Alert System
Impact Sensor Battery Disconnect
Impact Sensor Door Unlock
Impact Sensor Fuel Cut-Off
Impact Sensor Post-Collision Safety System
Inside Rearview Mirror Auto-Dimming
Interior Carbon Fiber Trim
Linked Or Integrated Apps - Security: Remote Locking
Linked Or Integrated Apps - Security: Remote Locking Horns And Light
Linked Or Integrated Apps - Vehicle Utility: Parked Car Finder
Linked Or Integrated Apps - Vehicle Utility: Service And Maintenance
Linked or Integrated Apps - Information and Entertainment: Google Search
Memorized Settings Includes Audio System
Memorized Settings Includes Climate Control
Memorized Settings Includes Driver Seat
Memorized Settings Includes Exterior Mirrors
Memorized Settings Number Of Drivers: 2
Mirror Color Body-Color
Multi-Function Display
Multi-function Remote Proximity Entry System
Multi-function Remote Trunk Release
Multi-function Remote Vehicle And Key Memory
Navigation System Hard Drive
Navigation System Touch Screen Display
Navigation System With Voice Recognition
Number Of Front Headrests 2
Number Of Rear Headrests 2
One-Touch Windows: 1
Passenger Seat Heated
Passenger Seat Power Adjustments: 10
Passenger Seat Power Adjustments: Recline
Phone Voice Activated
Phone Wireless Data Link Bluetooth
Power Brakes
Power Steering Speed-Proportional
Power Windows
Reading Lights Front
Reading Lights Rear
Real Time Traffic
Rear 12V Power Outlet
Rear Brakes Ventilated Disc
Rear Bumper Color Body-Color
Rear Floor Mats
Rear Seats 40-20-40 Split Bench
Rear Seats Split Folding
Rear Spoiler Lip
Satellite Communications BMW Assist
Seatbelts Emergency Locking Retractors: Front
Seatbelts Emergency Locking Retractors: Front And Rear
Seatbelts Seatbelt Force Limiters: Front
Seatbelts Seatbelt Pretensioners: Front
Seatbelts Seatbelt Warning Sensor: Driver And Passenger
Seatbelts Second Row 3-Point
Seats - Driver Seat Power Adjustments: Height
Seats - Passenger Seat Power Adjustments: 4-Way Power Lumbar
Seats - Passenger Seat Power Adjustments: Height
Seats - Upholstery Accents: Cloth
Seats Front Seat Type: Sport Bucket
Seats Leather Upholstery
Security Anti-Theft Alarm System
Security Engine Immobilizer
Sport Suspension
Stability Control
Steering Wheel Mounted Controls Audio
Steering Wheel Mounted Controls Cruise Controls
Steering Wheel Mounted Controls Multi-Function Screen Controls
Steering Wheel Mounted Controls Phone
Steering Wheel Power Tilt And Telescopic
Storage Door Pockets
Storage Front Seatback
Suspension Front Arm Type: Lateral Links
Suspension Front Shock Type: Gas Shock Absorbers
Suspension Front Spring Type: Coil Springs
Suspension Rear Coil Springs
Suspension Rear Gas Shock Absorbers
Suspension Stabilizer Bar(s): Front
Suspension Stabilizer Bar(s): Rear
Tachometer
Tail And Brake Lights LED
Taillights Adaptive
Touch-Sensitive Controls
Traction Control
Trip Odometer
Universal Garage Door Opener
Vanity Mirrors Dual Illuminating
Vehicle Assistance App - Roadside Assistance
Warnings And Reminders Low Fuel Level
Window Trim Black
Windows Front Wipers: Intermittent
Windows Front Wipers: Rain Sensing
Windows Lockout Button
Windows Rear Defogger
Vehicle data is subject to change without notice. The publisher assumes no responsibility for errors and/or omissions in the data and reserves the right to cancel, to terminate or not to process orders where the price or other material information on this site is inaccurate.
Consumer Reviews for the 2016 BMW M4

No reviews found. Be the first to submit a review!

Dealer Information

Dealer

Dalton, GA 30719